Multi-Beam High Efficiency Klystron
PI: Dr. Hien Tran (Professor of Mathematics and Director, CRSC)
Support: Calabazas Creek Research Inc. Department of Energy
Period of Performance: September 1st, 2024-August 31st, 2026
Budget: $30,000
Summary: Develop optimization design criteria and mathematical methods for optimization to achieve high efficiency multi-beam klystrons.